Tuesday, January 06, 2009     Register | Login | Search | Contact Us
     

Many of you already received communications about the move of the Cadence user community into cadence.com. And many of you have already joined, with over 4000 registrations in the first two weeks.

The new Cadence Community enhances the ability of Cadence users to connect and collaborate. In addition to moving the community into cadence.com -- enabling single sign-on for community, Sourcelink and Cadence events -- the new site is organized around nine technology segments, giving you easy access to product information, training, forums and blogs. Some of the new features include:
  • Ability to respond to posts via e-mail
  • Technology-specific blogs
  • Latest Web 2.0 social networking capabilities
  • Public profile options
  • Private messaging
  • Friends lists
Visit the new Cadence Community today at www.cadence.com/community and join the discussions!

Registration note: Due to the scope of the enhancements and the new SSO registration system, we were not able to migrate existing cdnusers.org member accounts. So new registrations are required, but this enables a broader set of functionality we think you'll enjoy.

Forum note: Under the guidance of forum moderators, we have taken the 20+ cdnusers.org forums and consolidated them into 11 forums on the new site. Posts have been brought over so you can leverage that posting history. CDNusers forums will be set to read only starting 7/30, and cdnusers.org will be redirected to the new community on 8/4.

Best regards,
Mike and Tom

Michael A. Catrambone - Steering Committee Chairman
Distinguished Engineer
PCB/Mechanical
UTStarcom, Inc.

Tom Diederich
Cadence Community Manager
Home
Forums
Subject: STA considering IR drop
Posting to forums is available to community members only.
Login or Register
Rate this topic:
   
Author Messages
clsantos
Posts: 31
Online: User is Offline
10/30/2006 6:59 AM  
Hello,

Worst case average IR drop is generated considering a PVT point which is different from both worst and best case PVT points for timing analysis (I use both corners to check hold and setup violations).

Should I run IR drop analysis considering:

  • the same PVT points I will use for STA?

  • the PVT point for worst IR drop and so run STA considering this PVT point?

  • the PVT point for worst IR drop but using the PVT point for worst/best case timing when running STA?

If I consider the PVT point for worst case voltage drop I won't check the worst/best case for STA, and checking worst/best case for STA I won't check for worst case for voltage drop. At the same time, if I use worst case for IR drop and worst/best case for STA I"m considering an invalid PVT point.

So, what is the recommended methodology to run a safe timing analysis considering IR drop?

Regards,

Cristiano.

Posting to forums is available to community members only.
Login or Register

Forums > Digital IC > Floorplanning, Place and route > STA considering IR drop


ActiveForums 3.6
     
Copyright 2006 Cadence Design Systems, Inc.